Production

What each piece costs to make, including the research, review and approval that dominate the total — and how much the organisation can actually get out of the door.

The idea

How it works

Production estimates cover the making and omit the rest. Research, internal review and approval usually cost more than the writing or the filming, and none of it appears in the number anybody plans against.

Capacity is the binding constraint and is rarely modelled. A plan built from what would be good to publish, and never checked against what can be approved in a month, will be met by reducing quality rather than volume.

Working with it

In practice

  1. 01

    Cost the whole path, not the making

    From first research to published. The making is often the smallest segment and the only one estimated.

  2. 02

    Find where things actually wait

    Measure the queue at each step. It is almost always approval, and almost always attributed to the writers.

  3. 03

    Model capacity before planning volume

    How many pieces can genuinely be produced and approved in a normal month, with someone away. That number is the plan’s ceiling.

  4. 04

    Keep buffer, and defend it

    A plan with no slack breaks the first time someone is ill, and it breaks where the audience can see it.

One level in

The components of production

A component is something that exists afterwards which did not exist before — a deliverable or a mechanism, not an intention.

  1. The cost per format

    Fully loaded, from research to published, including the review cycles.

    Learn
  2. The constraint

    Where work actually waits, measured rather than assumed.

    Learn
  3. The capacity

    What can be produced and approved in a normal month, with the buffer that lets it survive one.

    Learn

Measure the queue at each step. It is nearly always approval, and it is nearly always blamed on the people making the work.