Lifecycle · The replacement schedule · Element

The condition

How the asset is actually holding up against the expectation.

The part

What it is

Condition assessment is what turns a schedule from a calendar into a plan. Assets diverge from their expected life in both directions.

Rising failure rate and rising maintenance cost are the two readings that precede failure reliably.

The smallest level

The attributes it carries

Each attribute is one of the framework’s shared types. What a date is, and how it is written, is defined once for the whole model — the note here says what it means in this particular place.