Established model

Value stream mapping

Mike Rother & John Shook · 1999

Draw the whole path a product takes, with the waiting included, and the waiting turns out to be most of it.

Its place in the frameworkBusiness CoreManufacturing Operations

What it does

Both material and information flow are drawn on one page, with processing time and elapsed time recorded separately. The ratio between them is the finding: in most processes the time spent actually adding value is a small fraction of the time the thing exists, and nobody believes that until they have drawn it.

Reach for it when
Before improving any step, so the effort goes where the time actually is.
Where it stops
It is a snapshot of a repeatable flow. Applied to work that varies from case to case it produces a tidy picture of something that never happens twice.

Mike Rother & John Shook, Learning to See, Lean Enterprise Institute, 1999.

Why it sits at Manufacturing Operations

Where things are actually made — capacity, flow, quality and the maintenance that keeps all three possible. Applies wherever the organisation produces rather than only assembles.

A model is only useful when you reach for it at the right moment. This one answers a question that arises here — so it is filed here, and nowhere else. These are the working areas it serves:

All of Manufacturing Operations

What it touches elsewhere

Nothing in a business is decided on its own. A conclusion reached with this model at Manufacturing Operations lands in these other cores, whether or not anyone follows it there.

Filed at the same place

These answer questions that arise at Manufacturing Operations too. Where they disagree with this one, the disagreement is the useful part.

Elsewhere in Business Core

These are other people’s models, named here so you can go to the source and use them properly. The Omnigoal is not affiliated with their authors and is not endorsed by them; nothing of theirs is reproduced here — no canvas, no diagram, no wording. Each is described in our own words, with the originator credited, because the framework is a place to put thinking, not a replacement for the people who did it. Model names and trademarks belong to their respective owners and are used here only to refer to the work itself.

All 125 models