Market Timing · Market readiness · Component

The prerequisites

What has to exist for the solution to work at all — each one checkable, and their absence is the answer.

The deliverable

What it is

Solutions depend on things outside themselves: an enabling technology, a regulatory permission, a behaviour that has become normal, or infrastructure being widespread enough.

Each prerequisite is checkable and the check is quick. Where one is absent, the timing question is answered without further analysis.

One level in

What it is made of

Each element is a constituent part of the component. Follow one to see the attributes it carries.

  1. The list

    What the solution depends on.

    3 attributes: Prerequisite · Type · Present

    Learn
  2. The status

    How close each is.

    3 attributes: Status · Expected · Current level

    Learn
  3. The blocker

    Which absent prerequisite is decisive.

    3 attributes: Prerequisite · Could we build it · Cost to build

    Learn

Write the prerequisites before the market research. A missing one makes the research unnecessary.