Compliance · Controls · Component

The evidence trail

What the control produces as proof that it ran — generated by operating rather than assembled before an audit.

The deliverable

What it is

A control with no trace cannot be demonstrated to have worked, which for regulatory purposes is close to it not having worked.

Evidence assembled retrospectively is expensive, incomplete and less credible, which is three reasons to design it into the control.

One level in

What it is made of

Each element is a constituent part of the component. Follow one to see the attributes it carries.

  1. The artefact

    What is produced when the control operates.

    3 attributes: Artefact · Generated · Shows

    Learn
  2. The retention

    How long the evidence must be kept, and where.

    3 attributes: Retention period · Required by · Conflicts

    Learn
  3. The accessibility

    Whether the evidence can actually be produced when asked for.

    3 attributes: Held in · Retrieval time · Can retrieve

    Learn

Evidence created specifically as evidence is weaker than evidence produced by the control operating.