Manufacturing Operations · Capacity planning · Component

The capacity model

Practical output per period, per resource, with the constraint identified — because output is set by one step and not by the average.

The deliverable

What it is

Capacity is set by the constraint. Adding capability anywhere else changes cost without changing output, which is why so much capital investment produces no measurable improvement.

Theoretical capacity is a specification; practical capacity, after maintenance, changeover and variability, is what plans should be built on.

One level in

What it is made of

Each element is a constituent part of the component. Follow one to see the attributes it carries.

  1. The resources

    Each resource with its practical output per period.

    3 attributes: Resource · Practical output · Theoretical output

    Learn
  2. The constraint

    The resource that actually limits total output.

    3 attributes: Constraint resource · System output · Identified

    Learn
  3. The deductions

    What reduces theoretical capacity to practical capacity.

    3 attributes: Deduction · Share lost · Addressable

    Learn

Re-identify the constraint after every capacity change. Relieving one constraint creates the next.