KPI management · The review · Component

The exceptions

What was outside its band and therefore discussed — because discussing everything spends the meeting on things that have not changed.

The deliverable

What it is

Exception-based review halves most meetings and directs the remaining time at what actually moved. It requires the variation band to exist, which is why that work comes first.

The measures that were inside their band should still be listed, so that a reader can see they were checked rather than forgotten.

One level in

What it is made of

Each element is a constituent part of the component. Follow one to see the attributes it carries.

  1. The flagged

    Measures outside their normal range.

    3 attributes: Measure · Distance from band · Direction

    Learn
  2. The skipped

    Measures inside their band, listed but not discussed.

    3 attributes: Measure · Periods without exception · Removal candidate

    Learn
  3. The explanation

    Why each exception occurred.

    3 attributes: Reason · Established · To confirm

    Learn

A measure permanently inside its band and never discussed is a candidate for leaving the set.