Contingency Planning · Slippage · Component

The history

How late things have actually run — the organisation’s own record rather than a general assumption about optimism.

The deliverable

What it is

Every organisation runs late in a characteristic way. The pattern is specific, stable and measurable, and almost none of them measure it.

Planned duration against actual duration, for the last twenty things finished, is enough to size a buffer properly.

One level in

What it is made of

Each element is a constituent part of the component. Follow one to see the attributes it carries.

  1. The record

    Planned against actual.

    3 attributes: Work · Planned · Actual

    Learn
  2. The baseline

    Which plan is being measured against.

    3 attributes: Baseline set · Rebaselines · Reason

    Learn
  3. The coverage

    How much of the work is in the record.

    3 attributes: Coverage · Includes cancelled · Period

    Learn

Measure against the first committed plan. Against the current plan, everything is on schedule and everything is late.