The scope

What is being done, and what is deliberately not — the second half doing most of the work.

The deliverable

What it is

A scope listing only inclusions is read generously by everyone with an interest, and the differences emerge months later as a disagreement about what was always meant.

The exclusions are what make the inclusions mean something. They are also what nobody wants to write, because writing them requires saying no in advance.

One level in

What it is made of

Each element is a constituent part of the component. Follow one to see the attributes it carries.

  1. The inclusions

    What is being delivered.

    3 attributes: Item · Priority · Separable

    Learn
  2. The exclusions

    What is deliberately not being done.

    3 attributes: Excluded · Reason · Commonly assumed

    Learn
  3. The assumptions

    What the scope depends on being true.

    3 attributes: Assumption · Depends on · Confirmed

    Learn

Something not mentioned is assumed to be included. State exclusions rather than relying on omission.