Marketing Channels · Channel economics · Component

The loaded cost

Everything the channel costs, not just the media line — because production and management frequently exceed the spend.

The deliverable

What it is

The media line is the visible part. Production, management time, tooling and agency fees are the rest, and for content-heavy channels they dominate.

Comparing channels on media cost alone systematically favours the ones with high production requirements, which is the opposite of what the comparison is for.

One level in

What it is made of

Each element is a constituent part of the component. Follow one to see the attributes it carries.

  1. The media

    What is paid for the placement itself.

    3 attributes: Media spend · Period · Share of total

    Learn
  2. The production

    What making the material costs.

    3 attributes: Production cost · Production time · Reusable

    Learn
  3. The management

    What running the channel takes in time.

    3 attributes: Management time · Whose time · Estimated value

    Learn

Production cost scales with the number of channels rather than with spend. That is an argument for fewer, done properly.