Culture · Shaping it · Component

Culture shift brief

One assumption to move from and towards, why the strategy needs it, what must be protected on the way, and the evidence that would show movement.

The deliverable

What it is

Culture change described in adjectives — more agile, more customer-centred — cannot be tracked and is quickly absorbed into the espoused level. The brief narrows the ambition to a named assumption and the behaviour it produces, which is small enough to observe and large enough to matter.

It is the cultural intent of a change, not the change programme. Structural changes, decision rights and the management of adoption sit in the Organisation object; the brief says which assumption they are meant to move.

One level in

What it is made of

Each element is a constituent part of the component. Follow one to see the attributes it carries.

  1. From and to

    The current assumption and the intended one, each stated plainly and linked to its entry in the assumption map.

    3 attributes: Current assumption · Intended assumption · Strategic reason

    Learn
  2. Protected strengths

    The parts of the existing culture the change must not damage, named so they can be watched throughout the shift.

    2 attributes: Strength · Evidence of it

    Learn
  3. Evidence of movement

    The observable signs that would show the assumption moving, with a baseline and fixed dates for re-reading.

    3 attributes: Indicator · Baseline taken · Re-read on

    Learn

If the brief cannot name one assumption, it is describing a mood. Moods do not shift on request.