Responsibility · Commitments and targets · Component

Target pathway

The interim milestones between baseline and target, the levers expected to deliver them, and the dependencies outside the organisation’s control.

The deliverable

What it is

A target states where the organisation intends to be. The pathway states how it expects to get there, which is the part a sceptical reader examines first and the part most often missing.

It is a planning artefact that stays linked to the rest of the organisation’s plans. The measures used to track progress are defined and collected under KPI management in the Data Core; the pathway sets the expected values they are compared against.

One level in

What it is made of

Each element is a constituent part of the component. Follow one to see the attributes it carries.

  1. Interim milestones

    Dated checkpoints between the baseline and the target, at least one of which falls inside the current planning cycle.

    3 attributes: Checkpoint · Expected value · Status

    Learn
  2. Reduction levers

    The specific changes expected to move the numbers — process, product, energy, sourcing — with their expected contribution and cost.

    3 attributes: Lever · Expected contribution · Estimated cost

    Learn
  3. External dependencies

    What the pathway relies on that the organisation does not control, such as grid decarbonisation, supplier action or new technology.

    3 attributes: Dependency · Confidence · If it fails

    Learn

Add up the expected contributions of the levers. If the sum falls short of the target, the pathway has already said so.